Marcus Mariota Sports Performance Center
Location: University of Oregon – Marcus Mariota Sports Performance Center
Duration: Planning/Design – Jan. 2015 through Feb. 2016 Installation – Mar. 2016 through Aug. 2016
Client: University of Oregon – Athletic Department
Key Project Contributors:
Phil and Penny Knight
Hoffman Construction
SRG Architects
OPPORTUNITY
Provide storage solutions for the athletic equipment department. points of emphasis being appearance, functionality, and capacity.
SOLUTION
– Seven highly customized Spaceesaver mobile shelving systems –
– Four wallmounted tilt lift platforms –
– Three overhead lift platforms –
– Thirteen Powered security slat doors –
– Custom accessories to store what was required –
MMSPC Overview
"High usage items that need stock on hand - including gloves, sweatbands, footballs."
All Sports - Mezzanine - Daily Use/Player Boxes
Helmet Room - Security - Equipment lifts
Features
Motorized Carriages Touchscreen LED Controls Front Display Cabinets
Hinged Doors with Ajar Sensor
Roll Up Security Doors
16' Tall Mobile Shelving
Puddles the Duck Vinyl Overlay
Drawers with Removable Wire Bins
Garment Rods
Bat Racks
"Equipment from Baseball, Lacrosse, Soccer, and Acrobatics/Tumbling"
Accessories and Custom Installations
Framed Doors W/Ajar Sensors
Custom Handles
Bin Dividers and Fronts
Bat Racks
Drawers With Custom Bins
Rolling Cabinets
Stainless Steel Slat Walls
Garment Rods
Spacesaver Specialists Personnel:
Design/Planning: Jim McCord, Tom Gustafson, Tom Miller
Installation: Matt Reader, Mitchell Brown, Aleph Fechter, Jason Moffett, Bill Koehler, Mark Herr, John Rasmussen, Jacob Garrison, Austin Cross, Allan Goodwin
From the design concepts to the final product, seeing this project develop and evolve was something very special for all of us involved. We are proud to have had an opportunity to be part of something so special. A warm thanks to Phil and Penny Knight, the University of Oregon Equipment staff, the team from Hoffman Construction, and SRG Architects.